Project background
A petrochemical operator in the Middle East planned a scheduled turnaround on three vacuum distillation columns and needed to replace the complete mist eliminator inventory. The original pads had been in service for over nine years and were sagging in the centre, which allowed liquid carryover into the overhead line and forced the plant to run the columns below design throughput.
The engineering contractor in charge of the revamp approached Anping Zhaotong Metal Netting Co., Ltd in the first quarter of the project, asking for a wire mesh supplier able to deliver both the knitted mesh and the finished demister pad assemblies against a fixed turnaround window.
The technical challenge
- Aggressive service condition. The overhead vapour stream carried chlorides and intermittent caustic wash, so carbon steel and 304 grades were ruled out early.
- Rigid geometry. Pad thickness had to stay within ±3 mm of the original to fit existing support grids and the manway opening.
- Zero-slip schedule. All material had to arrive at the port of discharge at least three weeks before the shutdown started, because a late delivery would have pushed the whole turnaround.
- Traceability. Every bundle needed heat number, wire diameter and certificate pack attached, ready for a third-party inspection agency.
What we supplied
We proposed a corrugated knitted wire mesh construction in SS316, produced on circular knitting machines from 0.2 mm wire, then crimped into the herringbone profile that gives the pad its drainage path and stiffness. Corrugated and flat sections were supplied so the contractor could build the layered configuration specified by the process licensor.
| Parameter | Specification delivered |
|---|---|
| Material | Stainless steel 316 knitted wire mesh |
| Wire diameter | 0.2 mm |
| Mesh width | Up to 500 mm, custom slitting available |
| Surface form | Corrugated and flat, layered build-up |
| Pad thickness tolerance | ±3 mm against client drawing |
| Certification | ISO 9001:2015 with mill certificates per heat number |
| Packing | Waterproof paper inside, plastic cloth outside, wooden case |
| Lead time | 7–10 days after payment confirmation |
How the order was executed
- Sample approval. Free cut samples of corrugated SS316 mesh were air-freighted within 72 hours for the licensor to check profile height and open area.
- Pre-production meeting. Drawings were confirmed against the existing support grid dimensions supplied by the contractor, avoiding on-site trimming.
- Batch production and inspection. Mesh was knitted, crimped, cut and packed in one flow, with in-process checks on wire diameter, mesh count and pad weight per square metre.
- Documentation. Certificate packs were compiled per bundle so the inspection agency could release material on arrival without re-testing.
Results after restart
All three columns were re-packed inside the planned window and the unit restarted on schedule. In the first six months of operation the operator reported:
- Liquid carryover into the overhead system dropped below the 0.1 % vol. target set by the engineering contractor.
- No measurable sag or displacement of the pads during the internal inspection at the next planned shutdown.
- Pressure drop across the pads stayed within 8 % of the design value, so the column could run at full throughput again.
Why the relationship continued
The same contractor placed follow-up orders for two additional columns and for the refinery's sour water stripper. What made the difference was not only the material grade but the discipline around geometry, documentation and delivery — the three points where demister projects usually slip.
For operators planning a similar revamp, the lesson is simple: specify the wire diameter, the surface form and the thickness tolerance in writing, and lock the certificate requirements into the purchase order before production starts.
![]()